Joomla addon by poker sites best.
Infrastructure
All parcels are equipped with a complete utility infrastructure:
- Gas supply
- Electricity supply (630 kVA)
- Water supply
- Sewage system
- Telephone line / DSL
- Asphalted road
- Walkways
- Street lighting
Favorable transport connection:
- direct to the federal highway D55 Županja – Vinkovci - Vukovar
- 5 km from the highway A3 Zagreb - Belgrade
- 6 km from the railway station in Zupanja, which has a cargo track
- 10 km from the border with Bosnia and Herzegovina - border crossing Orašje
- 30 km from the harbor of Vukovar
- 30 km from the border with Serbia - border crossing Lipovac
- 56 km from the airport in Osijek
- 100 km from Hungary
- 256 km from Zagreb